PROJECT + NOVI HIGH SCHOOL FITNESS CENTER EXPANSION

BEST CEMENT MASORY PROJECT: BAC AWARDS 2025
NOVI HIGH SCHOOL FITNESS CENTER,
located in Novi, MI

The project expanded the athletic campus with modern facilities, improved access, and durable infrastructure designed to support students, staff, and visitors for years to come.

As the cement masonry contractor, Simone Companies delivered high-quality craftsmanship across all masonry elements, contributing to both the functionality and visual appeal of the finished facility.

PROJECT SCOPE

Cement Masonry Work
Structural and architectural cement masonry throughout the fitness center
Precision-executed concrete elements supporting long-term durability
Clean, consistent finishes aligned with the school’s design standards

FACILITY IMPROVEMENTS

Construction of a new fitness center facility
New restroom facilities to support athletic programming
New entrance to the athletic fields enhancing circulation and access

SITE AND ACCESS ENHANCEMENTS

Sidewalks and pedestrian approaches to the facility
Improved pathways designed for safety, accessibility, and ease of use

RESULTS

The completed fitness center is a functional, visually strong addition to the Novi High School campus. Built with skilled union craftsmanship, the project reflects a commitment to quality construction and community investment—creating a space that supports student wellness and school pride.

PROJECT + SPORTS FIELD CONSTRUCTION

Simone Companies specializes in the construction of high-performance athletic facilities, delivering complete solutions across a wide range of sports and recreational environments. Our expertise includes post-tension concrete tennis courts, pickleball courts, and multi-purpose sports courts, as well as the construction of synthetic turf baseball, softball, and football fields. From site preparation and concrete work to finished playing surfaces, our team understands the technical demands, precision, and durability required for these projects.

At Simone Companies, quality is the foundation of everything we build. We are committed to superior craftsmanship, traditional construction methods, and long-term performance—ensuring every athletic facility we deliver meets the highest standards for safety, functionality, and longevity.

PROJECTS FEATURED ABOVE

Carlson High School Post Tension Tennis and Pickleball Courts
Garden City Middle School Post Tension Tennis and Pickleball Courts
Plymouth High School Post Tension Tennis Courts
Romeo High School Synthetic Turf Baseball and Softball Fields& Natural Turf Softball Field
Stevenson High School Post Tension Tennis Courts and SyntheticTurf Baseball and Softball Fields

PROJECT + TROY SMITH MIDDLE SCHOOL PROJECT

Simone Companies was honored to work at Smith Middle School in Troy, Michigan, to deliver comprehensive site development services that support both campus infrastructure and the surrounding natural environment. This project demonstrates our commitment to building safe, functional, and sustainable spaces for the communities we serve.

Our team began with detailed earthwork preparation, including clearing, excavation, grading, and compaction to create a stable, build-ready foundation for the site. Precise grading ensured proper drainage patterns and long-term structural integrity across the campus and parking areas. We also installed underground utilities designed to manage runoff and reduce the impact on local waterways.

PROJECT + GROSSE ILE - SPORTS DIAMOND DEVELOPMENT

Simone Companies proudly worked at Grosse Ile High School to transform its baseball facilities into a high-performance, future-ready athletic complex. The “Field of Dreams” project showcases our team’s expertise in land development, precision grading, and sports field preparation — all built on decades of experience and a commitment to excellence.

Our work began with a complete redevelopment of the site, starting from the ground up. The team engineered and installed a comprehensive drainage system designed to keep the fields durable, safe, and playable in all weather conditions. With drainage established, we moved into shaping the subgrade, ensuring a stable, consistent base that would support every layer to come.

Simone Companies imported and placed the necessary structural materials, including rock and sand, building up the foundation of the new diamonds with exacting accuracy. Every layer was meticulously compacted, measured, and refined to meet the performance standards required for modern athletic surfaces.

The final step — and one of the most critical — was delivering a high-precision finished grade. Our team sculpted the fields to achieve perfect surface performance, including forming elevated pitcher’s mounds engineered to regulation height and slope. This preparation ensured the site was fully ready for the installation of advanced AstroTurf® surfacing, setting the stage for exceptional playability and long-term durability.

The Grosse Ile “Field of Dreams” stands as a testament to Simone Companies’ craftsmanship, rooted in tradition and supercharged with technology. From underground work to final grading, our union craftsmen bring unmatched skill to every project — delivering results that elevate both performance and community pride.